Large-Load Policy Board

A living board of the bills, dockets, market notices, and tariff orders that set how hospitable each jurisdiction is to new large-load interconnection. Posture is scored by Hyperscape Digital. Detected filings are machine-found and unpublished until a principal confirms them.

Jurisdictions
13
Seeded instruments
16
Detected filings
1
Last scanned
Aug 24, 2026, 3:31 AM UTC

Jurisdictions

Recent instruments

Seeded from the published record. Titles, citations, dates, and source links are extractive — not a posture call.

Aug 19, 2026

U.S. FederalDocket

NERC proposed Computational Load Owner / Operator registration criteria

NERC Rules of Procedure Appendix 5B posting, August 2026; FERC RD26-7-000

Source →

Aug 10, 2026

OhioCost shift

Ohio sits inside PJM's state-level large-load cost-allocation debate

Ohio Capital Journal, August 10, 2026

Source →

Aug 10, 2026

PJMCost shift

PJM large-load plan shifts cost questions to the states

Ohio Capital Journal, August 10, 2026

Source →

Aug 4, 2026

ERCOTInterconnection reform

ERCOT pauses Batch Zero large-load interconnection study

ERCOT Market Notice M-A080326-01

Source →

Aug 3, 2026

TexasAudit / self-generation

Texas Governor directs statewide data-center audit

Office of the Governor, August 3, 2026

Source →

Jul 28, 2026

PJMCost shift

PJM independent market monitor attributes ~46% of capacity cost to data centers

Monitoring Analytics / Joseph Bowring, late July 2026

Source →

Jul 15, 2026

New JerseyLarge-load tariff

New Jersey Assembly passes large-load data-center tariff

N.J. Assembly bill, ≥50 MW, 85% take-or-pay / 10 years

Source →

Jul 6, 2026

SPPInterconnection reform

SPP High Impact Large Load / Conditional High Impact Large Load Service

SPP compliance filing, ER26-1323-002

Source →

Jul 1, 2026

New YorkMoratorium

New York enacts statewide hyperscale data-center moratorium

Responsible Data Center Development Act

Source →

Jun 18, 2026

MISOInterconnection reform

FERC directs MISO to justify or rewrite large-load interconnection rules

FERC Section 206 show-cause, June 18, 2026

Source →

Jun 18, 2026

NYISOInterconnection reform

FERC directs NYISO to justify or rewrite large-load interconnection rules

FERC Section 206 show-cause, June 18, 2026

Source →

Jun 18, 2026

CAISOInterconnection reform

FERC directs CAISO to justify or rewrite large-load interconnection rules

FERC Section 206 show-cause, June 18, 2026

Source →

Jun 18, 2026

ERCOTInterconnection reform

ERCOT large-load batch study for requests of 75 MW and above

ERCOT Batch Zero classification process

Source →

Jun 18, 2026

TexasInterconnection reform

PUCT approves ERCOT Batch Zero process for ≥75 MW large-load requests

Public Utility Commission of Texas, June 18, 2026

Source →

Jun 18, 2026

U.S. FederalInterconnection reform

FERC Section 206 show-cause orders on large-load interconnection

FERC, June 18, 2026 — PJM, MISO, SPP, CAISO, ISO-NE, NYISO

Source →

Jun 15, 2026

VirginiaSiting / environment

Northern Virginia vacancy at an all-time low on record absorption

CBRE Global Data Center Trends, June 2026

Source →

Watcher — Detected

Federal Register matches for “data center”, “large load”, and “colocation”. Status is Detected until a principal confirms or rejects the row. This is not a jurisdiction posture.

Aug 18, 2026

DetectedNoticeU.S. Federal

America's Great Corridors of Commerce; Request for Information

Federal Register 2026-16776

Source →

How this board is scored

Jurisdiction posture — Open, Conditional, Restrictive, or Paused — is a Hyperscape Digital judgment, updated only by a principal. The Federal Register watcher may add Detected filings; it does not move posture or invent HD implications. Confirmed rows stay extractive: title, citation, date, URL.

Market hospitality grades live on the HD Market Scorecard. Briefs that explain a move are on the Intelligence Desk.